Message 1 of 5
Not applicable
04-08-2019
01:13 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
As seen in the attached screenshot, Revit does not update the gross area schedule. On the left we see a seperate .RVT file that is linked in on the right. The link is saved, closed, and reloaded into the file on the right. The schedule does not update.
Thanks Revit.
What do I do?
Solved! Go to Solution.