According to "About Linked Models in Schedules" Schedules do not currently support text boxes.
I have a project where I need to keep a master list of sheets and list which bid package each sheet is in.
First, I set up yes/not parameters in each model for the sheets. Then I set up a second formula parameter to convert the Yes, or No to a Dot symbol. The formula text parameter will not read the yes/no parameter set in the linked model.
A-450 and A451 will be moved to a different category later, but for this example you can see that the dot isn't showing up for those two linked line items.
If there's already a way to get linked files to work like this, please let me know.
Solved! Go to Solution.