I have a plumbing count family. It is a Generic Annotation family that includes families for all of the occupancy types. They can be selected via a dropdown menu. Each family you place the occupant count in the Instance Parameter and the family does the math involved in figuring the counts.
Screenshot of the family in a project:
Screenshot of the family:
Is there a way to put these parameters into a schedule? Right now the family is doing all the calcs except for totaling the different occupancies together.
My initial thought is that it's not possible because each instance of the family for each occupancy type is using the same parameter. The math is just different in that version of the family. So how would Revit know to discern between 5 instances of the same parameter showing 5 different numbers. There would need to be some unique element in each to be able to filter and sort.
Thanks