Referencing Detail Views from other Files

Referencing Detail Views from other Files

Anonymous
Not applicable
3,998 Views
12 Replies
Message 1 of 13

Referencing Detail Views from other Files

Anonymous
Not applicable

This seems to have been on Revit's wish list for years but I don't think it has ever been implemented.  Is it or is it not possible to reference a detail view/section view from linked file are we still in the primative world of creating generic annotations and dummy sheets?

 

If you need more explanation here is the scenario: Two Revit files, one is the building core, the other is the curtain wall file.  The CW file is linked into the core file.  All the sheets live in the Core project file.  We created several details and sections in the CW file that need to live on sheets in the Core file.  How do you get the section cut annotations that were created in the CW file to parametrically show in the Core model?  Some sheets have details from both model files on them.  Possible or not possible?

0 Likes
Accepted solutions (1)
3,999 Views
12 Replies
Replies (12)
Message 2 of 13

DanFaba
Alumni
Alumni

Hello Shawn,

 

Reviewing your inquiry, I have gone through our available information to confirm that as of this moment, it is not currently possible to reference a view from a linked file.

 

This information can be confirmed in the article Dummy Callouts for Referencing Sheets in Linked Files. Click the title to view the article.





Dan Faba
Autodesk Revit Technical Support
0 Likes
Message 3 of 13

Anonymous
Not applicable

Hmm, disappointing but thank you for the reply.  Is there any indication from the powers that be at Adesk that this functionality will be implemented in a future release?  Is it even being investigated?  Or do I throw this in my "Things Revit should do better but for some reason doesn't" box with my frustrations about the never changing but always flawed plot dialog window?

Message 4 of 13

DanFaba
Alumni
Alumni

We would submit these requests under the Product Feedback survey, int he customer's words, so that the Development team may attempt to implement these upgrades and patches on future releases.

 

You can fill in the Product Feedback survey by clicking HERE.





Dan Faba
Autodesk Revit Technical Support
0 Likes
Message 5 of 13

Anonymous
Not applicable

Right, so beings how I am not the first one to ask about it (I found questions about this as far back as Revit 2009), can you tell me/us if they are working on it?  Can we expect an improvement soon?  Or is it Top Secret, need to know information only that you can neither confirm nor deny?  Honestly, I'd be satisfied just knowing that Adesk is at least trying to resolve the problem.  Thanks.

0 Likes
Message 6 of 13

DanFaba
Alumni
Alumni
Accepted solution

Our Development unit is working on this feature, to be released as soon as possible, however, we would still not have an official launch date for such updates, as these require testing and proper coding, before being sent to our customers. 





Dan Faba
Autodesk Revit Technical Support
0 Likes
Message 7 of 13

Anonymous
Not applicable

Ok, fair enough.  Thank you.

0 Likes
Message 8 of 13

jagostinho74
Collaborator
Collaborator

Hello,

 

We have developed Dummy callouts as a workaround.

 

See attached.

 

 

Assistant BIM/CAD Manager

Manchester, UK


0 Likes
Message 9 of 13

mneuRT47Y
Community Visitor
Community Visitor

It has been a few years since this was discussed. Has this feature been added to Revit yet?

Message 10 of 13

jmhanbyV4TDM
Advocate
Advocate

I am not seeing anything in V2021 that does this.  I checked the include linked file sheets in the sheet index but they don't show in the referenced pull down when referencing sections or details.

Message 11 of 13

JNowak
Explorer
Explorer

I am still not seeing this in v2024. Any updates on this?

Message 12 of 13

ToanDN
Consultant
Consultant

Even if it were possible, how would you display sheet number and view number of a view in another file on the reference call-out?

0 Likes
Message 13 of 13

SteveKStafford
Mentor
Mentor

Revolution Design's Workflow tools includes a feature called Autolink which can manage references to details on sheets in linked models. You type in values for detail/sheet numbers and it looks for an equivalent detail/sheet in linked models and "watches" that relationship for changes.

 

A work-around approach is to create equivalent sheets and dummy views in the active project so you can create a "real" view annotation reference to a local "dummy" version of their detail. If they change their detail or sheet number then it has to manually coordinated.


Steve Stafford
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.
EESignature