Would there be a way to create a schedule that schedules the totals fields calculations from individual assembly schedules? Attached are images clarifying what I want. As you can see each assembly has multiple concrete volumes all totaled together for an overall for the Panel. Then, I have a separate schedule showing all the Panels in the project, but even when "itemize every instance" is deselected, it still gives separate lines for the Additional Concrete volumes because the mark is different. Writing this out kind of gave me an idea on how to fix it, but I am going to post anyways since I've come this far! Will welcome ideas to see if they are in line with my own 🙂