Present values in a title block from schedules

Present values in a title block from schedules

giacco
Advocate Advocate
698 Views
6 Replies
Message 1 of 7

Present values in a title block from schedules

giacco
Advocate
Advocate

Hi,

From a series of schedules I have obtained some totals and other values. Is it possible to use these values, link them and present them in a title block?

 

What I need is advice on where to look for information, if anyone has had a situation, is it possible to do it with parameters or do I need to do it with dynamo?

Thank you.

0 Likes
Accepted solutions (2)
699 Views
6 Replies
Replies (6)
Message 2 of 7

admaecc211151
Advocate
Advocate

If without addin or dynamo,

you can present it on sheet by hiding title and put another schedule up there to present it.

Message 3 of 7

azad.Nanva
Advisor
Advisor

like what? give me some screenshot and what calculate values maybe i can help.

If it solves your problem, please click Accept to enhance the Forum.
Message 4 of 7

giacco
Advocate
Advocate

I need to replicate the format of an Excel sheet of a rebar Schedule summary, I can obtain all the necessary information from rebar Schedule.

What I need to understand is how to relate any information from any Schedule to a parameter that can be displayed in a title block. (or where you recommend I look for more information about it).

 

Immagine 2024-06-13 143846.png

 

This way I can generate a pdf file directly from Revit without having to export or rewrite the data in Excel.

The idea is that the title block reflects the format of the excel sheet.

Regards.

0 Likes
Message 5 of 7

TripleM-Dev.net
Advisor
Advisor

Hi @giacco,

 

Is there a Reason you can't place the schedules themself on the sheet?

 

Even with dynamo or API you have a variable amount of rows (correct?) so only way to do that with automation would be create textnotes and lines on the sheet itself, otherwise you need a lot of parameters in a titleblock.

Message 6 of 7

admaecc211151
Advocate
Advocate
Accepted solution

You can hide the sorting cons, title, and headers.

So that it looks like only a left Title (create by a calculated parameter) and a total value.

The only problem is you may create a single schedule for each total value, and you'll have a lot of trash schedules.

*Maybe Revit should let schedule and sheets can group by type Name, just like other views.

 

 

admaecc211151_0-1718348206297.png

There is a RVT with several wall and a sheet with total value (wall area) in it.

 

Message 7 of 7

giacco
Advocate
Advocate
Accepted solution

In the end I created a title block with a number of parameters where they are automatically completed through Dynamo

 

Thank you very much and greetings, have a good day.

 

Immagine 2024-06-16 134057.jpg

Calcolo ferri_2024-06-16_01-52-43.png