Multiple revision numbering

25 REPLIES 25
SOLVED
Reply
Message 1 of 26
Anonymous
9775 Views, 25 Replies

Multiple revision numbering

Hi

 

Is there a way to use multiple revision numbering system?  What I mean is for every stage of a project to have a diferent prefix on revision. Preliminary as P01, P02, P03 and so on, than for Tender: T01,T02,T03 and so on, and than for Construction: C01, C02, C03....I've tried to use numeric with prefix and alfanumeric as fixed figures but that work only with 2 systems and at first place alfanumeric have to be used othervise revision shedule is not in the right order. 

25 REPLIES 25
Message 2 of 26
L.Maas
in reply to: Anonymous

You can try it by sacrificing a field in the Rev schedule. Then you can combine two field to create your new rev number (here issued by and revision number).

In this case I sorted on date, requiring to use a proper format

 

Revs.png

 

 

Louis

EESignature

Please mention Revit version, especially when uploading Revit files.

Message 3 of 26
markcpduffy
in reply to: Anonymous

Hello,

 

Is there a way were i can number my revisions 1.1,1.2,1.3,1.4 etc & also having 2.0,2.1,2.2 then 3.0,3.1,3.2. all on the same sheet. We are using a CDE Central data system that sends drawings that have been reviewed for changes to the back of the line and then moves them up - example first drawing P1.0 then all team comment revisions 1.1,1.2 until the client reviews them and requests changes. Once those changes are done and we up-load to the CDE it numbers it as series 2.0, this drawing can theoretically go can go to the back of the line again once the client asks for more changes ie., 3.0  then 4.0 & so on until the client is satisfied all it's requirements are meet. 

Message 4 of 26
Anonymous
in reply to: L.Maas

I still need all columns. so it won't work for me. Anyway thank you for advise. 

Message 5 of 26
Alfredo_Medina
in reply to: Anonymous

@Anonymous  , @markcpduffy

 

Have you tried establishing a custom sequence with a custom prefix in this dialog box?

2018-05-31_10-31-38.jpg


Alfredo Medina _________________________________________________________________ ______
Licensed Architect (Florida) | Freelance Instructor | Profile on Linkedin
Message 6 of 26
Anonymous
in reply to: Alfredo_Medina

It works for one drawing, not for whole project because one drawing can have revisions sequence P01, P02, P03, T01, T02 while second P01, T01, T02, T03.

Message 7 of 26
Alfredo_Medina
in reply to: Anonymous

Have you tried the option of numbering revisions "per sheet"? instead of "per project"?


Alfredo Medina _________________________________________________________________ ______
Licensed Architect (Florida) | Freelance Instructor | Profile on Linkedin
Message 8 of 26

Alfredo,

 

i have tried by sheet. The alphanumeric sequencing in by sheet will only let you do as follows fr first numbers 1.0, 2.0,3.0 just like letters A,B,C. I  Need to find a way were I can make both numbers rise consecutivaly as well. Example 1.0,1.1,1.2 then 2.0,2.1,2.2 then 3,4,5 etc. For both numbers. At this stage I am not sure it is possible in Revit. If you could try what you mean and if it works I would be grateful for any advice.

regards

 

Mark

Message 9 of 26
ToanDN
in reply to: markcpduffy

Estimate the possible numbers of revisions and add them to the Alphanumeric list.  Then add them all in your Revisions list.  When you need to place the actual Revision clouds or check the Revisions box for Sheets, you can choose what already listed there.

 

Capture.PNGCapture1.PNG

Message 10 of 26
markcpduffy
in reply to: ToanDN

Thanks,

Much appreciated.
Message 11 of 26
Anonymous
in reply to: L.Maas

Hi L.Maas,

I just ran into the same problem in Revit 2018 and was wondering if there is any easier solution to that? We are now goint construction stage and need to continue the revisions from P01, P02, P03, etc, to C01, C02, C03, etc.

I didn't quite understand the method you suggested. So, I went to edit the title block and went into the revision schedule, combined the 'Issued by' with the 'Revision Number', but then what? I reloaded the title block into the project but couldn't see any difference anywhere. 

 

Can you explain a bit more the method?

 

Thanks,

Maria 

Message 12 of 26
nathaniel.mcmahon
in reply to: L.Maas

You can actually add revision sequence as a field and have it sort by that then hide it in the schedule table. Save you from having to go by year, date, month convention.

Message 13 of 26
Anonymous
in reply to: nathaniel.mcmahon

Has anyone solved this issue yet? How do we get the schedule table to pick either P01, P02 then C01 for sheet Number 1 then PO1, C01 C02 for sheet Number 2?

Message 14 of 26
paras.shahTEK7X
in reply to: L.Maas

Can you please brief the process of it?

Thanks in advance 

Message 15 of 26
YashshahEV
in reply to: L.Maas

Hi,

 

Can you please elaborate on the process used for getting this done. Also are we compromising on the clouds related to these revisions? Its require urgently, if you can help us, it will be really appreciated. 

Message 16 of 26
ToanDN
in reply to: YashshahEV


@YashshahEV wrote:

Hi,

 

Can you please elaborate on the process used for getting this done. Also are we compromising on the clouds related to these revisions? Its require urgently, if you can help us, it will be really appreciated. 


This is extremely easy in Revit 2022.  You can have as many Sets as you wish.

 

ToanDN_0-1642031243832.png

 

ToanDN_1-1642031273483.png

 

ToanDN_0-1642031552107.png

 

 

 

Message 17 of 26
dtobitt
in reply to: Anonymous

I've just upgraded our model to 2022 to try this, however, it did seem to go well with P1, P2 then T1, T2 but when I put C1, C2, it puts it at the bottom, i.e. in alphabetical order rather than date order, is there a way around this anyone know?  At the moment I've put xC1 to make it go to the top of the list

Message 18 of 26
ToanDN
in reply to: dtobitt


@dtobitt wrote:

I've just upgraded our model to 2022 to try this, however, it did seem to go well with P1, P2 then T1, T2 but when I put C1, C2, it puts it at the bottom, i.e. in alphabetical order rather than date order, is there a way around this anyone know?  At the moment I've put xC1 to make it go to the top of the list


Sort the revision schedule by Sequence.

Message 19 of 26
dtobitt
in reply to: ToanDN

Any possibility of a screenshot of that option, I don't seem to have one in the sheet issues/revisions schedule?
Cheers
Message 20 of 26
ToanDN
in reply to: dtobitt


@dtobitt wrote:
Any possibility of a screenshot of that option, I don't seem to have one in the sheet issues/revisions schedule?
Cheers

ToanDN_0-1647641428720.png

 

ToanDN_1-1647641447712.png

 

 