Multi-File Organization Best Practices

chughes
Collaborator
Collaborator

I am looking to determine a best-practice structure for projects with multiple project files.  I currently have a single-site, multi-phase, multi-building, multi-unit within buildings project.  I am trying to determine the best method to stay organized.  Below is a diagram outlining my thoughts on how to structure it.  I am open to suggestions and improvements.  It is complicated project, so I would like to establish a workflow for my team.  This diagram doesn’t account for consultants (that is a whole other level of complexity).

 

Do you treat each building as its own project and mash them together at the end in PDF form?  Do you issue 3-4 different sets of documents that reference the other document sets, that as a whole constitute the Construction Documents?

 

Project Diagram.png

 

Also looking for suggestions on managing details that are the same between different project files (buildings and units).  We have worked with a shared details file in the past.  It works, but is complex.

 

My brain hurts. 🤕

 

*edited to revise diagram and show Unit PDFs

 

0 Likes
1,471 Views
8 Replies
Replies (8)
Message 2 of 9

barthbradley
Consultant
Consultant

Well, the first thing that caught my eye is that "Overall Site Project" doesn't interact with anything. That seems odd to me.  

0 Likes
Message 3 of 9

chughes
Collaborator
Collaborator

My thought is to isolate that as much as possible and only show building pads.  Could be a flawed theory.  In reality the Building models will be linked in, but chiefly for reference only.

0 Likes
Message 4 of 9

chughes
Collaborator
Collaborator

Tumbleweeds..........

0 Likes
Message 5 of 9

barthbradley
Consultant
Consultant

...crickets too.  😉

0 Likes
Message 6 of 9

barthbradley
Consultant
Consultant

if you retitle your thread  "Multi-File Organization Best Practices and Free Porn", it might get more activity.  

0 Likes
Message 7 of 9

ToanDN
Consultant
Consultant
The flow chart looks great. As for your questions regarding documentation, it depends on a lot of factors: permit packages, bid packages, shear size of buildings...
0 Likes
Message 8 of 9

chughes
Collaborator
Collaborator

Rethought the workflow and looked at another option.  This option links all sub-models into a big, single project model, and from that model flows the PDFs and Construction Documents.

 

Project Diagram 2.png

0 Likes
Message 9 of 9

chughes
Collaborator
Collaborator

I could, but I don’t want to risk getting banned from the forum.  I need you guys too much.