Message 1 of 12
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
If working on a single site where 3 buildings are being constructed, what would be the best practice for linking all the files together within an office, so multiple people can work on the project?
I’ve thought of 2 possibilities:
- A single central model, where every building is modeled together.
- This isn’t great because the model will be slow
- A central model for the site, and linking 3 other central files (one for each building) onto the site file
- Is this even possible?
Solved! Go to Solution.