I am working on a project which has multiple buildings. I need to move one of the created buildings into a different phase (this will be a future phase).
I have selected all the elements of the building and put them into a group. Is it possible to change the phase of this group instead of having to select each component again and manually change the phase?
Or is it possible to select on elements within a group?