Weird one,
I have 2 floors overlapping as one is existing then demolished in 'new construction phase' and one is proposed in new construction phase.
I have them totally separate and they work, BUT
in the floor schedule one shows up and the phases show varied. if I change it in the table it then tells me floors overlap and the existing floor that is demolished becomes a new floor
they seemed to become linked by the floor schedule??
I have deleted them both and started again, they start totally separate but the table only shows one and has the phase varies again. yet if I look at each individual floor they have the correct phases. its only when I change it on the table that it seems to force the existing floor into a new floor???
any ideas?
here as set up and as it should be showing both phases (show all)
but if I change the phase created and demolished on the table it will take the red hatch floor that is supposed to get demolished and turn it into a new floor and then tell me they are overlapping.
More information:
I deleted the floor schedule and started a new one
that seemed to fix it - however
it seems that the view that I have open affects the floor schedule when I create it, I thought that would have nothing to do with it, and what populates it.
I need help on how setting up the floor schedule seems to affect the schedule in this way by linking it all. the schedule I used I have used in a template for ages and it never did that before.
confused!
Solved! Go to Solution.