Message 1 of 2
linked model realignment

Not applicable
07-10-2019
10:48 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
The arch model shifted project base point coordinates to n/s -3" at some point, and the model was aligned to the structural grid (linked file). on our last model exchange, the coordinates were 0,0 and the models did not align. we changed it back, and the linked models are still not aligning. any possible solutions that do not involve shifting the entire model 3 " ???