Your Link model (stair/bridge) is quite far away from the Internal Origin of Revit. Your Host model is very near the Internal Origin. I assume you intend to have the link land on the toposurface in the correct location. For that to happen your models need to have a common frame of reference.
The Link model is +3k meters from Revit's origin and +32 meters above zero elevation. How did you decide to start modeling it at that location? You need to create the Host model with the same logic you used for the Link model or vice versa. I see that the Survey Point has been moved away from the Project Base Point in the Host model. The files you shared do not have a Shared Coordinate relationship but that would be undone by the renaming of the files to upload them.
To return to the beginning: each model should be near Revit's origin; where you find the Project Base Point and Survey Point icons at the outset. In the host (site) model a survey file can be used to create a relationship with the site by linking and orienting the Survey (DWG assumed) as needed. Then Acquire Coordinates will align the Survey Coordinate System of Revit with the World Coordinate System of the DWG.
Create the stair/bridge model near the origin as well. You can either link the site model to the bridge or bridge to site. If you link the site model to the bridge you have to move it to align with the bridge and use Acquire Coordinates. If you do the reverse then you need to use Publish Coordinates on the Bridge model from within the Site model.
If you aren't interested in that relationship, don't have a site/survey file. Then just use the same logic you used to create the bridge (link file) to create the other file. Then you can link them using positioning option Auto - Origin to Origin.
Steve Stafford
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.
