Message 1 of 6
Not applicable
01-07-2017
04:55 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
After developing a design in Revit, I renamed Level 1 and Level 2 to DD First Floor and DD Mezzanine. Then I duplicated these views and named them First Floor Plan and Mezzanine Floor Plan. Then I generated a Room Finish Schedule. The level names are DD First Floor and DD Mezzanine. I want the level names to be First Floor Plan and Mezzanine. How do I do that?
Solved! Go to Solution.