Message 1 of 2
Integrating 2 projects together
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
We have a main house project and a separate detached ADU project that is linked in. Both structures will be applied for under the same permit so all the plans need to be together. For example the sheets need to be
A2.1 - House Level 1 Floor Plan
A2.2 - House Level 2 Floor Plan
A2.3 - House Roof Plan
A2.4 - ADU Floor Plans
A2.5 - ADU Roof Plan
Currently we are planning on creating blank sheets with the names we need for the ADU stuff so the sheet schedule is right, then using a pdf tool to put the sheets together. But is there a better way to do this?