How to use formula in schedule for occupant load

How to use formula in schedule for occupant load

gnarkill283
Collaborator Collaborator
871 Views
4 Replies
Message 1 of 5

How to use formula in schedule for occupant load

gnarkill283
Collaborator
Collaborator

I have a default area parameter and a text based parameter for the area per occupant which I manually enter into each areas' properties like so: image.png

I want to now create a formula which takes the area parameter and divides it by the area per occupant to get the load. How does one do this? Thanks

0 Likes
Accepted solutions (1)
872 Views
4 Replies
Replies (4)
Message 3 of 5

gnarkill283
Collaborator
Collaborator

Thank you and thank god it allowed me to do this with an area schedule because room one wouldn't have worked, but I need the occupant load to round up no matter what the decimal amount is so .1 = 1 person. How can I do this?

0 Likes
Message 4 of 5

gnarkill283
Collaborator
Collaborator

I somehow got this to work: https://forums.autodesk.com/t5/revit-architecture-forum/round-up-calculated-total-of-revit-schedule-... HURRAY!!! Maybe an architecture based program could include this ****!

0 Likes
Message 5 of 5

barthbradley
Consultant
Consultant

You can format the parameter values on the format tab.  

0 Likes