Groups and host levels

Groups and host levels

kadmonkee
Advisor Advisor
226 Views
0 Replies
Message 1 of 1

Groups and host levels

kadmonkee
Advisor
Advisor

here is the scenario

3 buildings (1) Model each building has its own levels  set up, each building has its own workset for sorting

residential (7 floors) 15 unit types set up as groups per building designation

(BLDG 1 UNIT A1) on workset BLDG 1, BLDG 1 LEVEL 1, all components within the group are assigned to

BLDG 1 LEVEL 1.

when copying to another level everything works well until that group is copied into another workset (BLDG 2) and another Buildings Levels (BLDG 2 LEVEL 2) all components within the group need to be adjusted to suit the different BLDG assignment (WORKSET and BLDG Parameter can be easily adjusted to fit) Furniture , walls Mech Eqmt doors all need to be removed from the group reassigned and then added back into the group

new Group = BLDG 2 UNIT A1

there is a need to separate these BLDGs and Levels and all components within the model (phasing)

the initial model set up was not considered to be phased so this is a retro set up issue.

my question is this 

how can we leverage using groups and multiple Buildings and Levels without all of this disruptive work flow?

will scope boxes help by assigning levels and grids to each scope box?

any help is greatly appreciated.






If there is any information shared that is of value please give Kudos
If a solution is provided by any posters please mark them as Solved to benefit everyone else.
thank you
0 Likes
227 Views
0 Replies
Replies (0)