Hi, i need to synchronize all dimensions in my project with at least copied View (with the possibility to change Stages on each View Separately). It’s bad that in copied view you can synchronize walls and etc. but can’t synchronize dimensions. I tried to create a Dynamo script but it turned out being super complicated to make well working script. Can you please help me? Thank you

0 Likes
Accepted solutions (1)
4,830 Views
33 Replies
Replies (33)
Message 21 of 34

Simon_Weel
Mentor
Mentor

I can't set different Stages on thoese Views!

Ah, ok. Annotation is view-dependent. So text, dimensions, tags, detail items / lines etc. live in their own view. If you want them in other views as well, then you'll have to copy them. Or maybe there's a plugin that does the job.

Message 22 of 34

syama2001
Contributor
Contributor

Yes, when i do this, i am not able to set separate Stages of each View. This is the problem

0 Likes
Message 23 of 34

syama2001
Contributor
Contributor

Exactly, i would like it to be automatic. Is there any way to do it? I couldn't find any solution on Internet or ChatGPT

0 Likes
Message 24 of 34

azad.Nanva
Advisor
Advisor
Accepted solution

Why you don't use the Group and Attached Detail Groups ?

 

(view in My Videos)

If it solves your problem, please click Accept to enhance the Forum.
Message 25 of 34

ramneetkaur86
Contributor
Contributor

@syama2001 @you simply need to choose duplicate view with detailing. That ways you will get the dimensions and also be able to change view phase as per requirements. 

0 Likes
Message 26 of 34

syama2001
Contributor
Contributor

Yes, but when i draw new dimension it will not appear automatically on the copied View

0 Likes
Message 27 of 34

syama2001
Contributor
Contributor

This method looks good. But what will happen if i draw new dimension on the main View?

0 Likes
Message 28 of 34

seydauzun
Enthusiast
Enthusiast

@syama2001 ,
If they are not dependent they cannot be syncronising. You can ad lines on the objects and create groups from them  maybe. Lines and dimensions group. Then copy to other views... Or you crets dependent view, and you keep it as dependent allways, till the last moment where you have to seperate them, you finish with dim work and seperate them.. 

0 Likes
Message 29 of 34

syama2001
Contributor
Contributor

Is there any other way to make it simple? Just synchronize dimensions between VIews with different Stages

0 Likes
Message 30 of 34

azad.Nanva
Advisor
Advisor

@syama2001 wrote:

This method looks good. But what will happen if i draw new dimension on the main View?


 

if it is in group so you see that in another view too,but if it is not in group you don't see it in another view. this is a group ,if you change it in a view it will be changed  in all view.

If it solves your problem, please click Accept to enhance the Forum.
0 Likes
Message 31 of 34

syama2001
Contributor
Contributor

So to add dimensions i need to draw them in Group Editing mode?

0 Likes
Message 32 of 34

seydauzun
Enthusiast
Enthusiast

Yes, or when you add new dimension, you add into the group

Message 33 of 34

ToanDN
Consultant
Consultant

In general, repeating dimensions in different views is redundant.  In existing/demolition views are for dimensioning / locating existing elements to be demolished.  New construction views are for dimensioning / locating new elements.

Message 34 of 34

syama2001
Contributor
Contributor

Thank you for help guys! You are the best!