Message 1 of 2
Material volume in a schedule
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have been trying for a bit to work this out but need help if there is any. I work for a precast company and have an architectural layer and structural layer. The family I have is made with two layers of precast material but want to have both volumes given into a schedule that also provides other parameters like weight, size and a few other bit of information. Is is possible to have this outside of a material takeoff?