Hi all,
I have this pipe-assembly that is generated via a linked excel.
The pipe can be anywhere between 6000 and 25000mm.
There are two lifting eyes on the wall of the pipe, at 1/5 of the length from each edge.
The assembly updates beautifully, maintaining all constraints as I want.
I'm having difficulty with the IDW.
As the pipe can be very long, I want to place a break line which cuts the pipe section between the two lifting eyes.
I placed the break lines more of less exactly in the middle, right between the (centered) lifting eyes.
If I change the excel from a long to a short pipe section, the break lines do not stay centered, causing one or both lifting eyes to disappear in the broken section. Dragging the break line makes the lifting eye appear again, but ideally I would like to keep everyting centered.
I have a more-or-less equal assembly that does seem to keep everything centered, but after a long time of comparing all settings, I can't seem to find why the one works much better than the other.
Is there a way to keep the break section centered in the base view?
Thank you in advance!