Please look at including dynamic road side grading features such as benching in cuttings and fill slopes with InfraWorks having the ability to intuitively know whether it is in Cut or Fill and inserting a table drain as required. The height and slope should be able to be modified for each.
This is critical in our business for conceptual road design, particularly in comparative assessment between Tunnels and Cuttings arrangements for options analysis and costing.modified.