Interstate Bridge with offramp ion the bridge?
When ramp is added to 1st bridge, another (no. 2) new bridge is added.
Problem is No.2 bridge now has abutment in the water.
If abutment is deleted grading then slopes water acording to grading.
Need to be able to add off ramp in bridge. This is common in the interstate highway design.
