cancelar
Mostrando los resultados de 
Mostrar  solo  | Buscar en lugar de 
Quiere decir: 

Add material consumption to multiple products at once

Add material consumption to multiple products at once

It would save a lot of time to be able to add a specific raw material consumption to multiple new products at once. For example, I have 4 similar parts with different names but the same material and same quantity and I would love to be able to add it all at once instead of having to go into each individual product. 

5 Comentarios
martins_andre
Autodesk

Hi @haley_stump
Thank you for the idea. Just to clarify, are you refering to the consumptions on the bill of materials at product level? Or, on production records through the workers?

haley_stump
Participant

@martins_andre I am talking about the bill of materials for products when they are being created. 

martins_andre
Autodesk

Okay, thank you for the clarification. Have you tried using the excel importer to easily add BoMs in bulk?
Here is the link to our help center explaining it: How to import several BoMs 

andrade_david
Autodesk

Hello @haley_stump 

Did you have the time to revise @martins_andre's last message? The feature you are requesting is available in the product via Excel import. Thank you

andrade_david
Autodesk
El estado se ha cambiado a: Archived

Hello @haley_stump 

Since the flow you're requesting can be accomplished in the product, I've marked your idea as Archived. Nevertheless feel free to leave any further comments or feedback about this topic.

Thank you

¿No encontraste lo que buscabas? Pregúntale a la comunidad o comparte tus conocimientos.

Enviar idea