Max Tool Engagement For 3D Contour

Max Tool Engagement For 3D Contour

david
Enthusiast Enthusiast
591 Views
2 Replies
Message 1 of 3

Max Tool Engagement For 3D Contour

david
Enthusiast
Enthusiast

I'm running a ramping 2D Contour with a 3/32" tool and then a 3D Contour w/ Rest Machining using a 0.035" tool. I enabled a Helix type ramp for the 3D Contour, however that's not what's being generated. Because of the fragility of the 0.035" tool, I only want to engage the side of the tool no more than 1/2 the diameter. 3D Contour does not have a setting for max engagement. I also tried a 3D Adaptive Clearing but that generates a toolpath the removes material that after the first operation will not be there; a huge waste of time.

 

I attached a screenshot of the beginning of the second operation. How do I get the tool to lap the sides instead of taking a full swing at it? Thanks!

 

 

0 Likes
Accepted solutions (1)
592 Views
2 Replies
Replies (2)
Message 2 of 3

david
Enthusiast
Enthusiast

I came up with a solution. I switched to a 3D Adaptive Clearing and added more machining boundaries. By using a projected sketch, I created offsets of the edges that would encompass the left over material in the middle. Now the toolpath skips it because it's outside the machining boundaries.

 

 Autodesk_Fusion_360__Startup_License_.png

Autodesk_Fusion_360__Startup_License_.png

 

Thanks.

0 Likes
Message 3 of 3

BjoernJohnsson
Autodesk
Autodesk
Accepted solution

Hi

Regarding 3D adaptive cutting air, there is a rest option that is "from previous operation" that you can try. That should only cut stock left from the previous operations. 

Regards,

Björn Johnsson

Sr. Software Engineer for HSM CAM



Bjoern Johnsson

Principal Software Engineer
0 Likes