Message 1 of 2
How to best make a modified copy of a linked part?

Not applicable
10-24-2017
10:40 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have one project with hundreds of hours invested in it. All the parts are referencing one profile part, and these parts in turn are being referenced in a large assembly. My question is what is the best way to copy the whole "project" over in such a way that I can make minor adjustments to only the new project (I know the term project is used for a folder in fusion but in this case I mean the original work)? I copied everything from a folder to a new folder within the same project. Unfortunately, the parts are still referencing the original parts and not the ones I copied over. I've included a picture that best shows what I'm talking about without revealing too much. It's basically a modified extrusion from the linked part.