Hello,
What is the best way to setup different simulation studies on different components without them getting in the way of each other?
Within my design, I have multiple components and I would like to run independent simulation studies for each component individually at first. When I create a simulation study and remove all components except that one, it works fine. When I create a new simulation study for a second component, I then have to bring that component back into the simulation model components list by deleting the "remove" action in the Simplify timeline. Unless I keep switching back to Simplify mode to remove/un-remove components depending on the study I'm solving, I seem to get interference with previous studies/components. I'm not sure what is the best way to do this is and any advice would be appreciated!
Thank you,
Sima