Message 1 of 7

Not applicable
03-21-2020
03:34 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I'm creating a PVC frame, and I would like to create a couple pieces based on the design, so if I change dimensions of another part, it should automatically update. Basically, I want to center a T-fitting between two 45 degree fittings, then connect the three with PVC pipe.
So I would like to do two things:
1) Center the tee between the fittings
2) Create two pipes between the tee and fittings, based on the centered tee.
Thanks!
.
Solved! Go to Solution.