When comparing bids on the Bid Leveling tab in Building Connected Pro, it would be beneficial to have the option to input a mathematical formula in any given pricing line item field on the bid form. For instance, if a bidder combines the price for two line items into one line item and leaves the other line item field blank, it would be nice to be able to input a formula (such as percentage) in both fields to quickly adjust the pricing breakdown to match the bid form. Currently, you would have to perform the calculations outside of the Building Connected Pro platform and then manually enter the adjusted prices in each field. It would be ideal if all calculations could be performed and recorded within the platform. Thanks!