In the PCO tab of the change management module, if the user hard types a dollar amount into the estimated column of the grid for a cost item that has a unit cost, the default is to add the line as 1 unit at a unit rate of the hard typed value. The ideal function would be for the units to auto calculate backwards from the hard typed value and the unit cost of that cost item from the budget module. Example below.
Parameters:
Project manager's rate is $100/hr per the budget module.
Current function:
- $10,000 typed into estimated column field for a project manager cost item.
- Flyout window shows 1hr at a rate of $10,000/hr for a total of $10,000
Ideal function:
- $10,000 typed into estimated column field for a project manager cost item.
- Flyout window shows 100hrs at a rate of $100/hr for a total of $10,000 (the unite rate was pulled from that specific cost item in the budget module).
- Would be good to be able to still override the Quantity, rate, and total fields in the flyout window in case a different rate needed to be added. ex: 80hrs at $125/hr for $10,000.
The current function can remain as is for lump sum and similar functioning units.
@ian_turner