At this time, we can only assign the checklist by manually way from standard checklist template to each equipment ID, it will be more efficient and useful feature if we can assign standard checklist to selected equipment ID at a time. If example, if the project has 34 generators to install, for CxL2 checklist, now we need to manually assign 1 checklist to the generator no. 1 and repeat the step until finish generator no. 34 which lot of time consuming to get 34 generator installation checklist.