In my attached model I want the the conveyor lane that fills up to the Photo Electric Sensor to have the highest priority to have it's contents unloaded first. The purpose will be to call operators to prioritize the lanes that reach this point of fullness to avoid the system overfilling. Anytime when a lane reaches this level of fullness then an operator should be called to stop what they where doing to start unloading the full lane. Could someone please assist as I have tried for some hours already and used the tutorials etc. Thanks.

0 Likes
Accepted solutions (1)
358 Views
2 Replies
Replies (2)
Message 2 of 3

FelixMoehlmann
Mentor
Mentor
Accepted solution

With a single operator, editing the Queue Strategy of the operator to include the state of the upstream PE of the Exit Transfer would probably yield decent results.

If the plan is to use multiple operators, I would recommend to push the task sequences to a list. This gives you a much easier way to control which task an operator takes on next, by creating list expressions to sort by.

In the attached model I created the "urgent" field that is equal to 1 if the PE on the lane is blocked and 0 otherwise, for example.

0 Likes
Message 3 of 3

juan28A3P
Contributor
Contributor

Thank you Felix. Much appreciated.