Sometimes I copy/paste some points and links in SAC (for example, if I am doing several layers in my subassembly).
If I have point P2, P3,P4 and P3 is from P2 and P4 is from P3, then I would like an option when I copy those points to retain the relationship... I mean:
When I paste the new points P5, P6 and P7, I would like than automatically P6 was from P5 and P7 was from P6....
Please, retain "From Point", according to the new points.