Message 1 of 3
Not applicable
06-07-2021
08:40 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have a new proposed main road leading into a subdivision. I have multiple side cul de sac roads I want to connect into the new proposed main road. To get the grading right, how do I get the cul de sac roads to grade into the main road surface and the existing ground surface where it does not overlap the main road surface.
Solved! Go to Solution.