BIM 360 Insight – Reports default project setting

BIM 360 Insight – Reports default project setting

In BIM360 Insight it is possible to generate reports of a project. However, by default the project settings for reports are set on English, Fahrenheit and miles and inches. Our projects are set to Dutch (Field language) and Celsius (in Project home). This applies to all our projects on our hubs.


Currently, it is not possible to change the default Insight settings for all projects on hub/account level. New and existing projects. It is only possible to edit these settings at the project level. 

 

We would like to manage report settings of Insight at the account level. Perhaps this can be done by a project template for new projects which includes the report settings of Insight and being able to push those to existing projects?

 

 

 

1 Comment
chrish.Assemble
Observer

Also is it possible to set default cards that are public to the team for their visibilty?

 

mainly client and PM