it would be good if datalinked spreadsheets would check in and out with the project from Autocad Electrical.
We insert our "wire from to" report as a "PULL LIST", often this is several sheets, with a table inserted on each sheet from a named range.
When the tables are first created AE2014 will check the spreadsheets associated with them in.
If you do a "check out all" on a project that contains datalinked tables, the spreadsheeet that is datalinked is NOT checked out. One has to go into the vault client and get/checkout that spreadsheet outside the project.
This is true for checkin all as well... the datalinked spreadsheet will not be checked in with the project. (sometimes it does, most times it won't).