Change block layer with Excel input

- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I'm currently using AutoCAD 2014. I'm use to using AutoCAD but have never used VBA or AutoLISP before. Really just found out about them from doing some research on the internet and hoping for some help with my dilema. I have a floor plan already drawn and each individual room already has a seperate hatch created as a block. What I would like to be able to do is somehow make the layer of the block change to represent the percent completion of each room. I would ideally like to just be able to make an Excel spreadsheet that contains in column A the block title like Kitchen, Bath Room 1, Living Room, etc. and column B would contain the layer I want to move it to. So when I change column B from 20 to 30 the layer updates automatically. A couple different people will be imputting in to the spreadsheet which is why I want it to be able to the update automatically when needed. My floor plan contains about 60 different spaces (blocks) and has about 10 different colors (layers) to represent the percent completes. I'm not really sure how to go about this but I'm very much willing to learn. Eventually the drawing will grow to have over 300 individual blocks and around 12 layers. So you can see the amount of effort it would save versus selecting each block and changing it's layer individually.
Thanks,
JMB