We would like to set initial value for an UDP of new document from another UDP of the source document.
The practical use case is "Copied From" document number. In current copy process there is no reliable way to store the source drawing number on the target. It is essential Information for effective manufacturing planning to know, if and from which drawing (/model) the current one was copied from. With this, the manufacturing engineering results of the source design could be reused.