Vault Professional 2018 revision state behavior in Inventor
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello there,
Something we run into all the time.
How to make revisions while models are open in Inventor.
So I'm busy with a revision in a sub assembly and discover I have to make a revision on the main assembly as well.
In attachment I have placed screenshots of my Vault browser (In Inventor) with 4 steps.
1. My main assembly is locked, because it's released. Three yellow circles with exclamation mark are show for the already revised and checked in sub models.
2. In Vault professional the main assembly state is changed from released to Work in Progress. A triangle is shown after a refresh.
3. On the main assembly I do a "Get Revision..." Inventor asks me if I'm sure to change the local sub assemblies and I choose "No to All" expecting that my local file will not be overwritten.
4. Latest revision of the main assembly is local and Checked Out. But the Sub models are also replaced with the last Released state. Changes made are locally overwritten.
After step 4 I have to do a Get Revision on the sub files with triangles.
This behavior is very strange to me and I wonder what the proper protocol is or if there is a setting to be changed.
Hope anyone can help me with this, cause I'm afraid that in the future it might go wrong and changes are not saved.
Thanks in advance
Cees
