Incorrect quantities in PSP BOM

Incorrect quantities in PSP BOM

mvdberg
Advocate Advocate
888 Views
2 Replies
Message 1 of 3

Incorrect quantities in PSP BOM

mvdberg
Advocate
Advocate

The report of the BOM in Productstream Professional 2010 shows incorrect quantities. (see attachments). On a German forum someone mentioned that there is a hotfix for this issue, unfortunately he did not mention which one. I can not find a hotfix on the support side that applies to this problem. Please help

 

Regards, Martin

 

Edit: I think I partially solved the problem. I applied ts14051617 on the server and the standard report that came with PSP now shows correct values. My report which I copied from the original still shows incorrect values. Is there a way to solve this without rewriting the report?

Regards,
Martin van den Berg
NKM Noell Special Cranes GmbH
Inventor Professional 2019.3 + Vault Professional 2019.1.1
0 Likes
Accepted solutions (1)
889 Views
2 Replies
Replies (2)
Message 2 of 3

Redmond.D
Autodesk
Autodesk
Accepted solution

Try this.  In your Standard or Structured BOM report, go into the Report Parameters section and remove the "subst" parameters that set X_POSITION and X_QUANTITY. I believe this is the change that was done to the default reports in TS14051617.

 

Summarized BOMs should be correct without any edits.



Doug Redmond
Software Engineer
Autodesk, Inc.

0 Likes
Message 3 of 3

mvdberg
Advocate
Advocate

I removed both "subst" and it now works correct. Smiley Happy Thanks for the help.

 

Regards, Martin

Regards,
Martin van den Berg
NKM Noell Special Cranes GmbH
Inventor Professional 2019.3 + Vault Professional 2019.1.1
0 Likes