Change Revision Scheme from Alpha to Numerical Mid Lifecycle
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi All,
Our company has the practice of developing designs using alphabetical revision scheme (A,B,C etc.) and then releasing to production on 01 and continuing numerically from this point onward.
I've been trying to set this up in Vault Professional by using two revision schemes and using the Change Revision command to switch between Development and Production schemes.
My current workflow is to quick change a revision to allow editing and then use change revision to set the new revision scheme as shown below. By default my 3D files in this category are set to follow the Development revision scheme which follows alphabetical revisions upon entering Vault.changing revision scheme from alpha to numerical
This seems to work well and following revisions follow the new numbering scheme no problem.
Note the additional quick change state I had to use between released rev B and rev 01 to allow me to change the revision number. If possible I would like to find a way to remove this step.
Example of revision scheme change after release
Now lets say I want to add a new part to the production assembly (in this case a cross brace) it will first be assigned an alphabetical revision as previously.
New part created as revision A as expected
As with the previous parts changing the revision scheme to production gives me a numerical 01 initial release for the part.
changing new part revision shceme
When trying to release the main assembly Vault highlights restrictions stating that the new file is not the latest and will not let me release it at that revision.
Restriction after revision change stops me from relaseing the assembly with the new part
Is this workflow possible to achieve in Vault or have I just gone about it the wrong way. I would appreciate any info you may have.