Cannot print Change Order Summary

Cannot print Change Order Summary

mthomas
Collaborator Collaborator
4,356 Views
24 Replies
Message 1 of 25

Cannot print Change Order Summary

mthomas
Collaborator
Collaborator

Using Vault Pro 2012...

 

Whenever we try and print the change order summary we get a message... "There was an internal error and Internet Explorer is unable to print this document"

I've tried on a couple different systems and get the same results.

It doesn't seem to matter what the title is nor what we select to print. The Print Preview is displayed correctly, but when we attempt to print we get the error. I've tried numerous printers including our Xerox as well as the Microsoft XPS printer.

I'm using IE 9, my system has all Windows Updates.

 

Any ideas?

 

Mike

 

Mike Thomas

0 Likes
Accepted solutions (1)
4,357 Views
24 Replies
Replies (24)
Message 2 of 25

Senthil_Kumar
Autodesk
Autodesk

Mike,

 

The issue is with IE 9. I also see the same issue with IE 9 and not with IE 7 or 8.

 



Senthil Kumar
Development Manager,
Autodesk, Inc.


Be sure to check out the Vault Help!
0 Likes
Message 3 of 25

mthomas
Collaborator
Collaborator

So what are my options?

 

IE 9 is not my default browser (Google Chrome is) so I can't "trick" it that way

 

Mike

Mike Thomas

0 Likes
Message 4 of 25

Senthil_Kumar
Autodesk
Autodesk

Thanks for reporting this issue. We could reproduce the issue to Development team to take a look at this issue. Is there anyway you can try with IE 8 for now?



Senthil Kumar
Development Manager,
Autodesk, Inc.


Be sure to check out the Vault Help!
0 Likes
Message 5 of 25

Anonymous
Not applicable
Accepted solution

Mike,

 

The only way I have been able to "fix" the printing issue (among others in Vault) is to uninstall IE9.  It is not like I use it anyway (Chrome and Firefox only here).

 

In Win7, go to Control Panel\Programs and Features.  Click on "View installed updates" then scroll down to Microsoft Windows.  Right click on the Internet Explorer 9 update and uninstall.  It will automatically revert back to IE8 and fix the problem. (At least it did for me.)  

 

You will probably want to make sure you hide the IE9 update the next time it comes up in your Windows Update list.

 

Good luck,

 

0 Likes
Message 6 of 25

ndra
Advocate
Advocate

Stumbled onto this problem as well. Any fixes available yet?

 

Cheers

0 Likes
Message 7 of 25

Anonymous
Not applicable

I see this is still a problem with a new machine using Win7 32bit & VaultPro 2013.

 

No news?

0 Likes
Message 8 of 25

Anonymous
Not applicable

Correct... I have all current Hot Fixes installed for Vault 2013, and it still does not support IE9.  With IE9 installed on a machine, a change order summary cannot be printed.

 

See my previous post for a workaround.

0 Likes
Message 9 of 25

mthomas
Collaborator
Collaborator

Yep, still an issue with Vault Pro 2013. Autodesk Tech Support confirmed it as a defect for me, No current solution or a timeframe for a fix and as it was a problem in 2012 and 2013 I'm not holding my breath.

 

I appreciate the workaround but going back to IE 8 isn't really an option

 

Mike

Mike Thomas

0 Likes
Message 10 of 25

steveh5
Advisor
Advisor

This issue goes back to Vault 2010. Autodesk...GET IT FIXED!!!!

Only work around that we have found is to do screen shots.

 

Did I mention....Autodesk...GET IT FIXED!!!!

Steve Hilvers
Inventor Certified User / Vault Professional Influencer
0 Likes
Message 11 of 25

Anonymous
Not applicable

Smiley Wink

 

Yes. OneNote's snip tool has been a life saver.

 

I refuse to roll back IE because of this one issue.

 

Hope my machine doesn't catch fire when IE10 rolls around...

0 Likes
Message 12 of 25

edenblijker
Contributor
Contributor

Very strange autodesk has no solution after all those years.... Smiley Embarassed

0 Likes
Message 13 of 25

Anonymous
Not applicable

Success!

 

Win7 - 32bit

VaultPro 2013 - 17.0.62.0

IExplorer 10 - 10.0.9200.16521

Message 14 of 25

DannyvanDuijn
Advocate
Advocate

Thanks for sharing!

0 Likes
Message 15 of 25

Maxim-CADman77
Advisor
Advisor

Seems like IE10 is not the workaround itself

 

Have just tested on two configurations:

1.

Win7Pro x64 RUS

IE10.0.9200.16576

VaultPro2013 SP1 RUS (17.1.16.0)

 

FAILED to print

 

2.

Win7Ult x64 ENG

IE10.0.9200.16576

VaultPro2013 SP1 ENG (17.1.16.0)

 

SUCCESS printing

Please vote for Inventor-Idea Text Search within Option Names

0 Likes
Message 16 of 25

Anonymous
Not applicable

Just to continue the usage cases:

Printing change orders works on the new workstation I was recently assigned.

- En-US

- Win 7 Pro, 6.1.7601 SP1

- Vault Pro 2013, 17.0.62.0

- IE 10, 10.0.9200.16576

 

I hope not to be back when we roll out 2014.

 

0 Likes
Message 17 of 25

Senthil_Kumar
Autodesk
Autodesk

Uma,

 

I tried with the following same scenario and I do not see the issue. Please find the video showing the workflow that I do.

 

http://www.screencast.com/t/HtJ8wj9a

 

Win7Pro x64 RUS SP1

IE10.0.9200.16576 - Russian

VaultPro2013 SP1 RUS (17.1.16.0)



Senthil Kumar
Development Manager,
Autodesk, Inc.


Be sure to check out the Vault Help!
0 Likes
Message 18 of 25

Maxim-CADman77
Advisor
Advisor

On Friday there were at least 3 clients with issue reproducible.

 

Config of one I've described. Today I've tried to reproduce issue on that client and issue was not reproducible there.

 

Thus issue could be not permanent (there were no changes made neither to ADMS nor to the client since Friday). 

 

Then I made sure issue is still reproducible on other two (one RUS VE and one ENG).

But then IE9 was discovered on both. After updating IE the issue gone.

 

Thus situation is somehow improved in IE10 but can depend on something else.

Please vote for Inventor-Idea Text Search within Option Names

0 Likes
Message 19 of 25

Anonymous
Not applicable

I would like to offer my support for the "GET IT FIXED!!!!"  come on guys this appears to have  been a problem from 2010 and still does not work in 2014.

 

Thanks

 

MB

0 Likes
Message 20 of 25

kwilson_design
Collaborator
Collaborator

Please fix! 4+ years for this problem to still exist is unacceptable!!!

 

I would ge tthe error with IE9. Upgraded to IE10 and I no longer get the error, however once I select the printer to print to nothing happens. The printer never receives it and nothing is in the print que.

Regards,
Kenny
If this post solved your issue please mark "Accept as Solution". It helps everyone...really!
0 Likes