Hi, when assigning stories, does the building base level correspond to the bottom of all substructure elements i.e. basements, piles, foundations etc. or does it correspond to ground level i.e. location of building base shear?
Solved! Go to Solution.
Solved by Rafal.Gaweda. Go to Solution.
It is the lowest level from indicated by mouse or the level set by you manually
Still not quite clear. In seismic design (building period determination), the height of the building is usually calculated as that above ground. If I set my base level below ground, how will Robot calculate the building height
The approach you describe is kind of manual approach.
Robot uses modal results (analytical) based on FEM model \ calculations where the defined supports are considered. Definition of ground level does not matter for these calculations .
Can't find what you're looking for? Ask the community or share your knowledge.