Message 1 of 4
Scheduling connections
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have a clip angle connection, how do I schedule the components within this connections? I want the size of the angle, the length of the angle and the bolt information to appear on a schedule.