Message 1 of 3
Schedule Survey and Base Point Information
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Is there a way to schedule both Survey and Base point Information? I am looking to create a simple schedule that will calculate the difference between the two Elevation Values, so we can use that figure in a Calculated Parameter for a Framing Tag for Top of Concrete for Upstands and Parapet Walls in plan view. Is this possible? Struggling to find a way to do this.