Dear Sir,

Kindly note that  i have problem with  Adjusting Revision Schedule ; Because i  want to make Manually Modified ( as text ) according to speciall case in my current project , Where i should Adjust the Revision cloud for each sheet saparately

For Example:

If i wanna put two Dates for One Revision under same Name for that's Revision.

 

Please advise?

 

                                                                                                                                                       Thanks Alot Advance........

0 Likes
378 Views
1 Reply
Reply (1)
Message 2 of 2

SeanSpence
Advocate
Advocate

There are only a set number of parameters available for the revisions schedule. And unfortunately all of them are type based

 

Capture.JPG

 

SO the revision Schedule that appears in a title block wont have the flexibility of showing separate dates for each as you are suggesting.

 

Something you may want to do though is create a sheet index on a separate sheet. Those have a much greater selection of parameters to choose from. you can even create your own project parameter and assign it to sheets.

 

Below are the parameter for sheets out of my current project. the blue are the system parameters for revisions. the highlighted IFC date is what I use to keep track of when the sheet was originally issued for construction

 

Capture.JPG

 