Precast Scheduling

Precast Scheduling

emergesecondary09
Contributor Contributor
267 Views
1 Reply
Message 1 of 2

Precast Scheduling

emergesecondary09
Contributor
Contributor

I am trying to take the schedules for the hollow core slabs. In which i need the volume of the slabs. Kindly suggest a method to take the volume of each slab accurately in the schedule. I have attached a sample file to help this out.

0 Likes
Accepted solutions (1)
268 Views
1 Reply
Reply (1)
Message 2 of 2

jay_colcombe
Mentor
Mentor
Accepted solution

There are 2 ways to do this.

 

The Assemblies are made of Parts so you could simply create a Part Schedule instead of an Assemblies Schedule

 

jay_colcombe_0-1697530041397.png

 

Alternatively, from the Precast Tab > Shop Drawings this will automatically create a Material Takeoff for you.  (This can also be manually created using a Material Takeoff Schedule for Parts & Assemblies)

 

jay_colcombe_1-1697530130467.png

 

Jay Colcombe

Autodesk Certified Instructor
Revit Architecture & Structure Certified Professional
AutoCAD Certified Professional
B.Sc. Hons Civil & Structural Engineering

If you find my post interesting, feel free to give a Kudo.
If it solves your problem, please click Accept to enhance the Forum.
0 Likes