hy Everyone,

 

I am revit user for several months and now learning about Keynote

Very good feature, quickly for tag but i have a problem

How i put same keynote number but different keynote schedule on different sheet (floor plan)

I've tried but still failed, change in keynote setting, change 'txt file, etc

please help me to fixed up

2018-09-12_142514.png

example like above, same number in different sheet and must different keynote schedule

Thank you

0 Likes
Accepted solutions (1)
1,911 Views
1 Reply
Reply (1)
Message 2 of 2

dmiller_SCE
Collaborator
Collaborator
Accepted solution

You have two ways that you can control numbering of a Key Note Legend.  You control the method within the The Key Note Settings.

 

 

Numbering Method By keynote

Determines the keynote value by the value stored in the keynote parameter or selected from the keynote table. This value displays in the keynote as well as filling in the keynote parameter.

By sheet

Numbers keynotes according to their order of creation.

A value for the keynote parameter is still stored if one has been chosen.

A Keynote Legend displays the Keynote Number according to the order it was created instead. No number appears in the tag until the view bearing Keynote Tags is placed on a sheet view.

 

 