Message 1 of 3

Not applicable
05-06-2020
11:54 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I am using J-boxes to make Existing loads for a panel schedule, Phase A and C are fine and total correctly but Phase B has 2 J-boxes both with 1680VA and a Lighting circuit with a load of 2132VA this circuit has 2x4s, downlights, etc.. the total load should be 5492VA but the load is in at 5430VA and I can't figure out the issue. I deleted the J boxes and the total was 2132VA like it should be so it seems the issue is with the J boxes but neither of the other phases is having this issue and they are comprised on only J box loads.