Im having trouble fixing my panel schedule template for single phase panels.  Currently, the schedule is showing loads in the shaded cells.  I need them to only be shown in the clear cells. This is working fine with 3 phase panels.  Im just having trouble with this for single phase panels. 

 

Also, I dont think the phase currents are calculating correctly.  Could someone help me with this please?  Thanks!

 

 

0 Likes
2,578 Views
3 Replies
Replies (3)
Message 2 of 4

fabiosato
Mentor
Mentor

Hello,

 

 

Just one doubt, how can you connect two phase loads into a single phase panel?

If you can share a file only with the panel and the loads I can try to check the panel template. 

Fábio Sato
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.

EESignature

0 Likes
Message 3 of 4

Nathan_Lamb
Community Visitor
Community Visitor

I know this is old, but for the sake of anyone else coming across this post, "two phase" isn't a thing. There is a difference between "phase" and "pole." The loads can be single-phase, but still be two pole loads.

Message 4 of 4

cschroer
Contributor
Contributor

Hello,

There was a recent post that had the same question --> https://forums.autodesk.com/t5/revit-mep-forum/how-to-make-single-phase-panel-schedule-show-every-ot...

 