I'm having some trouble formulating and for edit a painel shedule for Revit eletrical. Im uploading a print of the screen to be clearly. The question si, how i can use Revit formulas to sum all the load in VA and in Watts, at the end of the table?
I tried to use this formula:
=SUM(Table.Loads.Power)
but the "=" and the "SUM" are giving some trouble to my formula
Anyone could help?